Business Paper 1 — Marketing and People
Vocabulary Precision List
WBS11 — Vocabulary Precision List (Unit 1: Marketing and People)
Provenance (2026-09-28). Built from a full read of
research/veridian/WBS11-verified-facts.md(all 13 sections), cross-checked against the two documents already built for this paper incontent/veridian/technique-hub/wbs11/—codex-definitions-and-application-bank.md(every term's full definition, organised by spec sub-section) andforge-exam-technique-guide.md(the full tariff-by-tariff command-word technique, §2, and the complete confused-pair index, §4.1–4.2) — read first so nothing below repeats either document's own ground. This document is deliberately narrow: it does not re-define every spec term (the codex already does that) and does not re-teach how to answer each tariff (the guide already does that). It exists for three things neither other document does: (1) a same-page, contrastive read of the command-word ladder aimed specifically at the boundary between adjacent commands, kept short because it is scaffolding for point 2, not new content in itself; (2) a documented, evidenced pattern — examiner-report prose sometimes describes a question's command word loosely, in a way that does not match the word actually printed on the paper and mark scheme, and this course's own earlier drafts were caught making exactly that error twice; (3) a single compact list distinguishing term-pairs the real archive confirms candidates conflate from term-pairs commonly taught as confused for which no primary-source evidence was found — the second half of that list (Part 4) has no equivalent anywhere else in this paper's materials. Not affiliated with or endorsed by Pearson Edexcel. Every quotation below is short (kept under roughly fifteen words) and attributed; nothing here reproduces a full question, extract or mark-scheme passage. Citation format follows the facts bank's own convention:[MS, series, Qx]for a verified mark-scheme quote,[PEF, series, Qx]for examiner-report commentary,[SPEC]for the specification itself.
Part 1 — The command-word ladder, read at its boundaries
This table exists only to anchor Part 2 below — for the full tariff-by-tariff technique (internal
mark splits, worked timing, what actually earns each band), see forge-exam-technique-guide.md §2.
What follows here is narrower: the one line that separates each command word from its immediate
neighbour, because that boundary is exactly where a misjudged answer shape costs marks.
| Command | Marks | Levels | The one thing its neighbour below does NOT require |
|---|---|---|---|
| Define | 2 | — (Knowledge only) | No Application or Analysis band exists at all — a correct fact beyond the definition itself earns nothing extra, and nor does an incorrect one cost anything beyond the two marks available [SPEC Appendix 6, p.56]. |
| Explain | 4 | — (K/App/An) | Requires two distinct points of application, not one point developed at length — confirmed independently five years apart: "two points of application are needed" [PEF, Jan 2023, Q2b]. |
| Analyse | 6 | — (K/App/An) | Explicitly excludes evaluation — "no evaluation" is printed in the command word's own spec definition [SPEC Appendix 6, p.56]. This is the last tariff on the ladder where a counter-argument is not just unrewarded but actively off-target. |
| Discuss | 8 | 3 | Tops out at Level 3 (6–8) requiring only "an awareness of competing arguments" — there is no requirement for a stated judgement or conclusion, and manufacturing one is unrewarded extra work at this tariff specifically [verified level descriptors, facts bank §2]. |
| Assess | 10 | 4 | Adds a fourth level, reached only by one addition over Discuss's ceiling: "leading to a supported judgement" [verified Level 4 descriptor, facts bank §2] — the first tariff on the ladder where a stated, condition-specific conclusion is actually required, not optional. |
| Evaluate | 20 | 4 | Structurally identical to Assess at greater length, but its own top band requires "a solution and/or recommendations" — genuine extra work beyond restating the judgement already reached [verified Level 4 descriptor, facts bank §2]. |
The two commands most often mistaken for each other in practice are Discuss and Assess, precisely because they look identical on the page (both ask for a counterbalanced answer about a named business) while differing in exactly one structural requirement — a stated judgement — that is easy to add unnecessarily to a Discuss answer (wasted time) or leave out of an Assess answer (a capped mark).
Part 2 — The paraphrase trap: the printed command word vs. how examiners describe it in prose
This is the genuinely new content in this document, not a restatement of anything already built for this paper. It is a documented pattern, not a hypothesis: an examiner report's own prose sometimes describes a question using a different verb, or a different mark total, than the one actually printed on that question and its mark scheme — and trusting the descriptive prose instead of the literal, printed command word has produced real, confirmed errors in this course's own prior draft material, caught only by re-fetching the primary mark-scheme PDF directly.
Three documented instances:
- June 2022, Q2(c) — checked and found safe, but the risk was real. The question's actual, printed command word is "Analyse" (6 marks, K2/App2/An2) — but the same examiner report's own prose elsewhere refers to this question family informally as "the 6-mark 'explain' questions," an examiner using the verb loosely rather than citing the literal command word. Re-fetching the real mark scheme directly from Pearson's own domain confirmed the printed command word does match "Analyse" here — this instance resolved safely, but only because it was checked rather than assumed correct by association with the loose paraphrase nearby.
- June 2023, Q2(c) — a real mislabelling this course's own material made. An earlier draft of this paper's research material recorded this question as an "Explain," following the examiner report's own paraphrase that "the questions instructed the candidates to explain the factors." Re-fetching the actual mark scheme found the real, printed command word is "Analyse" (6 marks, K2/App2/An2) — a genuinely different answer shape, since Analyse and Explain carry different internal mark splits and different expectations for how many distinct points are needed.
- January 2024, Q2(e) — a second, independent mislabelling, of a different kind. An earlier draft recorded this as an "8-mark Discuss." Re-fetching the real mark scheme found the actual question is a 10-mark Assess, with the four-level table described in Part 1 above, not the three-level Discuss table — meaning the earlier draft's version of this question was missing the entire fourth band, and the requirement for a stated judgement that comes with it.
The actionable rule this produces: when building a revision answer plan around a specific past question, verify its command word and mark tariff against the mark scheme's own printed heading and level-table structure (three levels vs. four is unambiguous even when the prose describing it is loose), not against a study summary's, a teacher's, or an examiner report's own descriptive paraphrase of what a question "is." This document names its own course's prior mistakes here deliberately, rather than presenting the discipline as a risk that only applies to students — the same loose-paraphrase trap caught two independent errors in material built for this exact paper before either was corrected.
Part 3 — Confirmed term-pairs: the exact line that costs marks when blurred
Each entry below is a real, cited, cross-series-confirmed confusion — not a plausible-sounding pair invented for this document. Where a lesson file or the codex already carries the full teaching treatment, it is named rather than repeated.
- Demand vs. want/need. Demand requires willingness and ability to buy at a given price over a
given period — a want or need alone is not demand. Confirmed trap: candidates "referred to needs
and wants rather than the willingness or ability to purchase" [PEF, Jan 2024, Q1a]. Full teaching:
demand-supply-and-elasticity.ts. - Qualitative vs. quantitative research. Qualitative research is about consumer opinions and
beliefs — not about the quality of the product, and not about numerical data. The single most
common Define-question error in the whole reviewed archive: candidates "thought qualitative
research was used to collect quality data" [PEF, Jun 2019, Q1a]. Full teaching:
meeting-customer-needs.ts. - Test marketing vs. product trial. Test marketing means selling in a limited area before full
launch; a product trial means giving consumers a product to try before release — genuinely
different concepts despite "some similarities." Confirmed, cross-series: candidates "provided a
definition of product trial rather than test marketing" [PEF, Jun 2024, Q2a]. Full teaching:
meeting-customer-needs.ts. - Market share vs. a sales or revenue amount. Market share is a percentage of total market
sales, never a standalone revenue figure. A response equating the two "received zero marks" [PEF,
Jun 2023, Q2a] — confirmed independently across three separate lessons' own anchors. Full
teaching:
meeting-customer-needs.ts,entrepreneurs-objectives-and-choices.ts. - Risk vs. uncertainty. Uncertainty is the inability to foresee or predict future outcomes — not
simply "an external factor." Confirmed trap: candidates "confused risk with uncertainty,"
referring to external factors rather than unforeseeability itself [PEF, Jan 2020, Q1a]. Full
teaching:
meeting-customer-needs.ts. - Mass market — defined by scale, not by price or competition. A Define answer that assumed low
prices and heavy competition were part of the definition itself was marked down: "not necessarily
the case" [PEF, Jan 2025, Q1a]. Full teaching:
forge-exam-technique-guide.md§4.2. - Product orientation vs. market orientation. Product orientation "develops products based on
what it is good at producing, rather than researching the market"; market orientation researches
the market and reacts to what it finds [MS, Jun 2022, Q2e]. Full teaching:
meeting-customer-needs.ts. - Marketing mix vs. design mix. The marketing mix is the four Ps; the design mix is function,
aesthetics and cost of manufacture — two adjacent spec points confirmed conflated: "still confusing
the marketing mix with the design mix" [PEF, Jan 2023]. Full teaching:
marketing-strategy-and-product.ts. - Cost of manufacture vs. price. A design-mix input is not the same variable as what the customer
is charged. Confirmed: "confused economic manufacture/cost with price" [PEF, Jan 2024]. Full
teaching:
marketing-strategy-and-product.ts. - Competitive pricing vs. penetration pricing. Competitive pricing sets price around competitors'
own level — it is not automatically low. Confirmed: candidates described it as "charging a very
low price," "possibly confusing this with penetration pricing" [PEF, Jan 2024, Q2e]. Full
teaching:
promotion-pricing-and-distribution.ts. - Demand factors vs. supply factors. Confirmed, named example: "too many students are still
confusing supply factors with demand factors, such as trends and advertising" [PEF, Jan 2024,
Q2c] — trends and advertising shift demand, not supply. Full teaching:
demand-supply-and-elasticity.ts. - Entrepreneurial motives vs. characteristics. A motive is why someone starts a business; a
characteristic is what trait they have. Confirmed independently twice, one series apart:
"confused entrepreneurial [motives with characteristics]" [PEF, Jun 2022, Q1c]; "confused
entrepreneurial characteristics with motives" [PEF, Jun 2024, Q2c]. A related, distinct third trap: a
difficulty described in the source extract is not automatically a motive — "it is not an
entrepreneurial motive" [PEF, Jan 2025, Q2c]. Full teaching:
entrepreneurs-objectives-and-choices.ts. - The flexible-workforce family is six distinct terms, not synonyms. Part-time, temporary,
zero-hours, flexible-hours, multi-skilling and homeworking are separately spec-named categories.
Confirmed three times independently: "candidates confused part-time workers with temporary or
zero hour workers" [PEF, Jun 2024]; an essay collapsed the whole category into "part-time workers"
alone, when it "includes multi-skilling, part-time and temporary workers, zero hours contracts,
flexible hours and homeworking" [PEF, Jan 2023]. Full teaching:
staffing-and-organisational-design.ts. - PED's sign convention. Price elasticity of demand is reported as a negative number; dropping the sign on an otherwise fully correct calculation forfeits a mark — "Award 4 marks for correct answer -2.5 / Award 3 marks for 2.5" [MS, Jun 2019, Q1b]. The single most consistently confirmed notation trap in the paper's numeracy content.
- An elasticity coefficient vs. a percentage-change answer — the rule inverts by direction, and both directions have a confirmed real error. When a question asks for the elasticity value itself (PED or YED, calculated forward from raw data), that value is a pure ratio and must not carry a percentage sign — a response that "showed the final answer as a percentage (3%)" when the required answer was the coefficient "3" is confirmed wrong [PEF, Jan 2024, Q1b]. But when a question instead runs the rearranged formula and asks for the resulting percentage change in demand or income — given a known elasticity value and one other percentage change, e.g. "0.6 x 5% = 3%" — the percentage sign becomes required, and its absence is the confirmed error there [PEF, Jun 2022, Q2b]. The same symbol is wrong in one direction and required in the other, depending on which of the two things the question is actually asking for.
Part 4 — Checked against the real archive and not confirmed: don't over-teach these as exam-precise
A vocabulary precision list should also say, plainly, which commonly-assumed "candidates always confuse these two terms" claims this paper's own real archive does not actually support — so that revision time isn't spent drilling a distinction the mark schemes have no recorded opinion on. This list has no equivalent anywhere else in this paper's materials.
- Job enrichment vs. job enlargement. Sometimes taught as a pair candidates "constantly confuse." No examiner-report or mark-scheme quote anywhere in the reviewed archive confirms this — both terms are spec-defined, but there is no primary-source evidence of candidates conflating them on a real script.
- Dismissal vs. redundancy, specifically as a claim that candidates confuse the definitions. Real, quoted exam evidence exists for a cost/legal consequence of a mishandled dismissal process during a redundancy round — "unfair dismissal cases… can be costly" [MS, Oct 2021, Q2c] — but no examiner-report quote in the archive confirms candidates actually conflate the two terms' definitions themselves. Teach the cost-consequence point as real; don't present "these two terms get confused" as an examiner-confirmed trap the way the flexible-workforce family above is.
- Span of control vs. centralisation. Span of control, hierarchy and chain of command are now confirmed, named terms in real mark schemes [RMS, Oct 2021, Q2e; RMS, Jun 2023, Q3]. Centralisation itself has never been directly examined in any of the seven series checked for this paper. The two concepts are genuinely close and worth teaching distinctly, but treat that as a sound study caution, not as a mark-scheme-confirmed confusion in the way every other item in Part 3 is.
- Sampling methods, Mayo and Herzberg by name, distribution channel stages. These spec terms
have no confirmed exam-question evidence in any series checked for this paper (up to nineteen
series, for some sub-points) — there is no real mark scheme to point to for a "precise distinction"
claim about any of them yet. See
forge-exam-technique-guide.md§6 for the full, disclosed gap list this paper's material works from.
Scope note
Grounded entirely in the six-to-nineteen-series archive (coverage varies by sub-point) described in
WBS11-verified-facts.md §0, plus the January 2025 and October 2024 series read independently for
forge-exam-technique-guide.md. Series not opened for either document — June 2021, October 2019,
January 2021, January 2022 — remain a genuine, disclosed gap; a future pass over them may surface
further confirmed pairs for Part 3, or move an item from Part 4 into it if real evidence turns up.
Nothing in this document extends beyond what a cited primary source actually states.